PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Electrical conduit at the 3rd Floor Facing East (600x800).jpg Excavation for the water tie in Facing North (800x600).jpg Grinding the main steel column at the Monumental Stairs Facing South (800x600).jpg Installed temporary lighting at the 1st floor Facing East (800x600).jpg Working on the skylight steel beam Facing South-East (800x600).jpg
Previous page Working on the skylight steel beam Facing South-East (800x600)
Working on the skylight steel beam Facing South-East (800x600)